§ 2.10.03. Performance and construction standards for communication towers and communication antennas.  


Latest version.
  • (1)

    Structural design. New communication towers/antennas and modifications to existing structures including, without limitation, the addition of height, antennas or providers, shall be constructed in accordance with all city building and electrical codes, and shall be certified by an engineer licensed to practice in the State of Florida.

    (2)

    Setbacks. Communication tower/antenna setbacks shall be measured from the base of the tower/antenna, or protruding building or structure at the base of the tower, whichever is closest to the property line, of the parcel on which it is located. Communication towers/antennas and their accessory structures shall comply with the minimum setback requirements of the district in which they are located and the street setbacks set forth in the Land Development Regulations. In cases where there is a conflict between the minimum setback requirements and the street setbacks, the greater setback shall apply. In addition, where there is a principal building housing a principal use located on the site, the communication tower/antenna and accessory structures to the tower/antenna shall be located behind the principal building.

    (3)

    Separation from off-site uses:

    (a)

    Communication tower separation shall be measured from the base of the tower to the closest point of off-site uses and/or designated areas as specified in subsection (b) below. For purposes of this requirement, global positioning system (GPS) coordinates for the center of the tower(s) may be used.

    (b)

    Location requirements. The separation distances from off-site uses (listed in linear feet) shall be as follows:

    Height (freestanding) 50 feet or less 51—70 ft. 71—120 ft. 121—160 ft. 161—200 ft.
    Required setback from property line Greater of 20% tower height or zoning district setback Greater of 20% tower height or zoning district setback Greater of 20% tower height or zoning district setback Greater of 100% breakpoint or zoning district setback Greater of 110% breakpoint or zoning district setback
    Minimum distance from single-family residential uses 150 ft.* 300 ft.* 600 ft.* 1,100 ft.* 1,300 ft.*
    Minimum distance from multi-family residential uses 150 ft.* 150 ft.* 300 ft.* 550 ft.* 650 ft.*
    Minimum distance from other on-site principal uses None Greater of 20% tower height or 20 feet Greater of 20% tower height or 25 feet Greater of 100% breakpoint or 25 feet Greater of 110% breakpoint or 25 feet

     

    *Provided, however, in no instance shall the separation distance be less than the breakpoint distance.

    (c)

    The minimum distance from residential uses shall be reduced to the breakpoint distance for towers located in power corridors of 240 kv or larger transmission lines, provided the towers and ground support and equipment serve a minimum of three (3) telecommunications service providers. Proof of such collection shall be submitted with the application in the form of a binding contract.

    (d)

    The minimum distance from residential uses shall be reduced by one-half (½) for camouflaged towers seventy (70) feet or less in height located adjacent to high volume roads, or in or adjacent to power corridor of 240 kv or larger transmission lines, provided however, in no instance shall the separation distance be less than the breakpoint distance.

    (4)

    Separation distances between communication towers:

    (a)

    Separation distances between communication towers shall be applicable for and measured between the proposed tower and those towers that are existing and/or have received land use or building permit approval from the City of Flagler Beach or adjoining jurisdictions. When more than one (1) application is simultaneously being reviewed, separation distances for all pending applications shall also be considered, including those pending in adjacent jurisdictions.

    (b)

    The separation distances shall be measured by drawing or following a straight line between the base of the existing tower and the proposed base, pursuant to a site plan of the proposed tower. For purposes of this requirement, GPS coordinates for the tower(s) may be used.

    (c)

    The separation distances between communication towers (listed in linear feet) shall be as follows:

    MINIMUM TOWER SEPARATION

    Tower Height <50 feet 50—70 feet 71—120 feet 121—160 feet 161—200 feet
    <50 feet 330 660 660 660 1,320
    50—70 ft. 660 660 660 1,320 2,640
    71—120 ft. 660 660 1,320 2,640 5,280
    121—160 ft. 660 1,320 2,640 5,280 15,840
    161—200 ft. 1,320 2,640 5,280 10,560 15,840

     

    (d)

    Separation distances shall be reduced by one-half (½) between two (2) or more towers located wholly within a light industrial zoning district provided the towers and ground support equipment serve a minimum of three (3) telecommunication service providers. Proof of such collocation shall be submitted with the application in the form of a binding contract.

    (e)

    Separation distances shall be reduced by one-half (½) between two (2) or more towers located wholly within a power corridor of 240 kv or larger transmission lines, provided the towers and ground support equipment serve a minimum of three (3) telecommunication service providers. Proof of such collocation shall be submitted with the application in the form of a binding contract.

    (f)

    Separation distances between towers one hundred sixty (160) feet or less in height located wholly within a commercial zoning district shall be reduced by one-half (½), provided the towers and ground support equipment serve a minimum of three (3) telecommunication service providers. Proof of such collocation shall be submitted with the application in the form of a binding contract.

    (5)

    Fencing. A chain link fence or wall not less than six (6) feet in height, with three (3) strands of barbed wire from finished grade shall be provided around each communication tower. Access to the tower shall be through a locked gate.

    (6)

    Landscaping. The visual impacts of a communication tower shall be mitigated for nearby viewers through landscaping or other screening materials at the base of the tower and ancillary structures. The following landscaping and buffering of communication tower shall be required around the perimeter of the tower and accessory structures. Landscaping shall be installed on the outside of fences. Further, the use of existing vegetation shall be preserved to the maximum extent practicable and may be used as a substitute of or in supplement towards meeting landscaping requirements.

    (a)

    A row of trees a minimum of eight (8) feet tall and a maximum of twenty-five (25) feet apart shall be planted around the perimeter of the fence; and

    (b)

    A contiguous hedge at least thirty (30) inches high at planting capable of growing to at least thirty-six (36) inches in height within eighteen (18) months shall be planted in front of the tree line referenced above; and

    (c)

    All landscaping shall be of indigenous vegetation.

    (7)

    Height:

    (a)

    No freestanding communication tower/antenna shall exceed two hundred (200) feet in height from ground level.

    (b)

    Where installed on top of a building, no communication tower/antenna shall extend greater than twenty (20) feet over the building height.

    (8)

    Type of construction. Communication towers shall be monopole construction; provided, however, camouflaged construction may be approved by the city commission at a special exception hearing, upon consideration of the following factors in addition to those set forth at Section 2.10.05.

    (a)

    Compatibility with adjacent properties;

    (b)

    Architectural consistency with adjacent properties;

    (c)

    Visual impact on adjacent properties, including visual access of adjacent properties to sunlight; and

    (d)

    Design of accessory structures in order to be architecturally consistent with the existing structures on the site. A variance from the fencing and landscaping requirements of this section may be requested for such accessory structures.

    (9)

    Development criteria. Communication towers/antennas shall comply with the minimum development criteria of the district in which they are located, pertaining to minimum lot size and open space.

    (10)

    Illumination. Communication towers/antennas shall not be artificially lighted except to assure human safety or as required by the Federal Aviation Administration. At time of construction in cases where there are residential uses within a distance three hundred (300) percent of the height of the tower, dual lighting shall be requested from the FAA.

    (11)

    Colocation:

    (a)

    Communication towers less than one hundred fifty (150) feet in height shall be engineered and constructed to accommodate a minimum of two (2) additional telecommunication service providers. Communication towers greater than one hundred fifty (150) feet in height shall be engineered and constructed to accommodate a minimum of three (3) additional telecommunication service providers.

    (b)

    Camouflaged communication towers may be engineered and constructed without accommodating additional telecommunication service providers.

    (c)

    Communication towers located within electrical substations may be engineered and constructed without accommodating additional communication service providers. Such towers shall be monopole construction and shall be subject to all of the requirements of this division.

    (d)

    Proposed communication antennas may, and are encouraged to, colocate onto existing communications towers. Provided such colocation is accomplished in a manner consistent with Sections 2.10.02 (permitted areas) and Section 2.10.03 (construction standards), such colocation is permitted and new or additional special exception approval is not required.

    (e)

    If determined by the city that the proposed tower is situated in a location which will benefit the city's telecommunication systems, then the tower shall be engineered and constructed to accommodate the additional telecommunicating equipment beneficial to the public system at a cost to the city no greater than the actual expense of the provider in so engineering and constructing the tower to meet the city's needs.

    (f)

    On-site location. A communication tower which is being rebuilt to accommodate the colocation of an additional communication antenna may be moved on-site within fifty (50) feet of its existing location, however, the antenna shall meet the setback requirements in Section 2.10.03. After the communication tower is rebuilt to accommodate colocation, only one (1) tower may remain on the site.

    (g)

    A relocated on-site communication tower shall continue to be measured from the original tower location for purposes of calculating separation distances between towers pursuant to Section 2.10.03. The relocation of a tower in accordance with this subsection shall in no way be deemed to cause a violation of Section 2.10.03. The on-site relocation of a communication tower which comes within the separation distances to residentially zoned lands or residential uses shall require variance approval.

    (h)

    Telecommunication service providers shall not unreasonably withhold the use of their tower for purposes of colocation.

    (12)

    Noninterference. No communication tower or antenna shall interfere with public safety communication. Frequency coordination is required to ensure noninterference with public safety system and/or public safety entities. Each application shall include a certification by a licensed engineer that no interference with public safety systems and/or public safety entities will occur. Additionally, each application for special exception or building permit where a permitted use, to allow construction of a communication tower shall include either a preliminary or a certified statement that the construction of the tower, including reception and transmission functions, will not interfere with two (2) GHz microwave systems, the use of hearing aids or the usual and customary transmission or reception of radio, television, etc., service enjoyed by adjacent residential and nonresidential properties. In the event only a preliminary statement is submitted with the application, a final, certified statement of noninterference will be provided and approved by the city prior to the issuance of a building permit. The statement shall be prepared by an engineer licensed to practice in the State of Florida or other professional accepted by the city.

    (13)

    Measurement of tower height. Tower height shall be measured from the finished grade at the base of the tower to the highest point of the tower or appurtenance attached thereto.

    (14)

    Exemption from minimum distance requirements. Communication towers installed and operated for public purposes by a federal, state, or local governmental agency shall be excluded from calculation of minimum distance requirements for communication towers operated for private purposes.

    (15)

    Certification required. All plans for construction of a communication tower, including foundation plans, shall be certified by an engineer licensed to practice in the State of Florida.

    (16)

    Hurricane evacuation routes. Communication towers shall not be constructed at a height and location that, in the event of tower failure, the tower may totally or partially block or impede any road or street designated as a hurricane evacuation route.

    (17)

    Documentation. Documentation to demonstrate conformance with the requirements of Section 10.40 shall be submitted by the applicant with all requests to construct, locate or modify a communication tower/antenna. A statement by the applicant as to how construction of the communication tower will accommodate colocation of additional antennas for future users shall be included with the documentation.

    (18)

    Signs and advertising. The use of any portion of a tower for sign or advertising purposes including, without limitation, company name, banners, or streamers, is prohibited.

    (19)

    Abandonment. Thirty (30) days before discontinuing use of a communication tower, the owner and/or operator shall provide notice of abandonment to the city. In the event the use of any communication tower has been discontinued for a period of one hundred eighty (180) consecutive days, the tower shall be deemed to have been abandoned. Upon such abandonment, the owner/operator of the tower shall have an additional sixty-one (61) days within which to (i) reactivate the use of the tower or transfer the tower to another owner/operator who makes actual use of the tower; or (ii) dismantle and remove the tower. The owner of the real property shall be ultimately responsible for all costs of dismantling and removal, and in the event the tower is not removed within sixty (60) days of abandonment, the city may proceed to do so and assess the costs against the real property. The lien of such assessment shall bear interest, have priority and be collectable, at the same rate and in like manner as provided for special assessments by Florida law. At the earlier of sixty-one (61) days from the date of abandonment without reactivation or upon completion of dismantling and removal, any special exception, or variance approval for the tower shall automatically expire.

    All towers on public lands require the posting with the city of a performance bond in an amount sufficient to ensure costs of removal prior to issuance of a building permit.

    (20)

    Finished color. Communication towers not requiring FAA painting/marking shall have either a galvanized finish or be painted a noncontrasting blue, gray or black finish. The color should be selected so as to minimize the equipment's visibility.

    (21)

    Birds of prey nesting. New freestanding communication towers shall incorporate a design that provides an integral nesting platform to direct the most likely site for birds of prey nesting to a location on the tower which will reduce the risk of interference with tower equipment and maintenance.

    (22)

    Aircraft hazard. Communication towers shall not encroach into or through an established, public or private airport approach path, as established by the Federal Aviation Administration (FAA). Each application to construct a communication tower shall include proof of application for approval from the FAA and shall be submitted with each special exception application for a communication tower. Based upon the location or height of a proposed tower, the city may require a statement of no objection from the Flagler County Airport Authority. A building permit for an approved communication tower shall not be issued until FAA approval is obtained.

    (23)

    Approval required from other governmental agencies. Each special exception, or building permit application where a permitted use, for a communication tower shall include written approval or a statement of no objection from other federal, state or county agencies that regulate communication tower siting, design, and construction.

    (24)

    Radiation standards. All proposed communication towers shall comply with current standards of the Federal Communications Commission for nonionizing electromagnetic radiation (NIER) and electromagnetic fields (EMF). Each special exception application or site plan application for a communication tower shall include preliminary or certified documentation or a statement from a Florida-registered engineer or other professional accepted by the city, indicating compliance with these standards. The city may hire a consultant to evaluate the required NIER or EMF documentation. The fee charged by the consultant shall be paid by the applicant. In the event only a preliminary statement is submitted with the application, a final, certified statement will be provided and approved by the city prior to the issuance of a building permit.

    (25)

    High voltage and "No Trespassing" warning signs:

    (a)

    If high voltage is necessary for the operation of the communications tower or any accessory structures, "HIGH VOLTAGE—DANGER" warning signs shall be permanently attached to the fence or wall and shall be spaced not more than forty (40) feet apart.

    (b)

    "NO TRESPASSING" warning signs shall be permanently attached to the fence or wall and shall be spaced not more than forty (40) feet apart.

    (c)

    The letters for the "HIGH VOLTAGE", "DANGER" and "NO TRESPASSING" warning signs shall be at least six (6) inches in height. The two (2) warning signs may be combined into one (1) sign. The warning signs shall be installed at least five (5) feet above the finished grade of the fence.

    (d)

    The warning signs may be attached to freestanding poles if the content of the signs may be obstructed by landscaping.

    (26)

    Equipment storage. Mobile or immobile equipment not used in direct support of a tower facility shall not be stored or parked on the site of the communication tower, unless repairs to the tower are being made.

    (27)

    Leaseholds. The applicant shall submit proof that the lease between the applicant and the landlord contains a provision that the landowner is responsible for the removal of the communication facilities in the event the applicant fails to remove them upon abandonment.

    (28)

    Public facilities. If the city determines that there is a governmental or public safety need, the city commission may grant specific waivers to this section in order to allow the construction of a public safety or governmental communication tower or communication antenna.

    (29)

    Environmental assessments. The applicant shall submit to the city a copy of environmental statements and environmental assessments and studies when such reports are required by regional, state or federal agency.

    (30)

    Reports. The owner or operator of each freestanding ground mounted communication tower or antenna shall annually submit a report to the city indicating the number of carriers or services and appearance of the facility. The annual report shall include an 8" × 10" color photograph of two (2) opposing views of the facility and a list of all antennas and equipment shelters and providers served by the facility. A copy of the renewed Federal Communications Commission license, as applicable, shall be included in the report. The report shall include a copy of the most recent structural certification from a licensed engineer and identify anticipated maintenance or modifications to the facility. The city may periodically request an annual report at other times during the year to verify the appearance and safety of the facility or to determine whether modifications have been made without city approval.

    (31)

    Approval revocation. Where a special exception(s) is not met within the time set forth in the terms of approval, the approval shall be revoked effective the expiration of the time period set forth in the applicable special exception, and the structure(s) shall be deemed abandoned and must be removed within sixty (60) days thereof.

    (32)

    Wiring plan. A conceptual wiring plan showing the fiberoptic lines and wires connecting the applicant's equipment and facilities together and identifying the owner of the lines and wires as well as the public property traversed shall be submitted with the tower or antenna application. Thereafter, a final wiring plan shall be submitted with building permit application. Copies of the conceptual and final wiring plans shall be provided to the city manager or his/her designee.