§ 2-311. Invitation to bid and/or request for proposals.
For the purposes of this section the word bid and proposal will be considered the same.
(1)
All bids must be advertised a minimum of one (1) time in a newspaper of general circulation at least fourteen (14) days prior to the bid opening unless the department head can document that all potential bidders have been given a copy of the bid package.
(2)
The advertisement shall include a brief description of the goods and/or services desired, where a copy of the bid package may be obtained, and the time and place for the bid opening.
(3)
The bid package shall contain the time and place for the bid opening, general conditions required of all vendors, some background on the project, a bid bond, a performance bond for all contracts where the bid may be in excess of fifty thousand dollars ($50,000.00), and the specifications for the product and/or services desired.
(4)
The use of brand names in a bid is permitted, but only for the purposes of establishing a standard. Brand names shall not be used as a way of limiting or restricting competition.
(5)
Any time constraints on a project must be identified within the bid package. Inability to meet the time constraints may be sufficient reason for a bid to be rejected.
(6)
All bids received after the time designated shall be returned unopened.
(7)
Prebid conferences may be held if needed. Attendance at a prebid conference can be but does not have to be mandatory. Notice of a prebid conference must be included in the newspaper advertisement and the bid package.
(8)
Every bid package shall contain a hold harmless provision whereby the contractor, to the fullest extent permitted by law, shall at all times indemnify, defend and hold the city harmless from and against any and all liability, loss, claim, suit, damage, charge or expense which the city may suffer, sustain, incur or in any way be subjected to, on account of death of or injury to any person whomsoever and damage to or loss of or destruction of any property whatsoever, arising from, or in any way connected with the construction project.
(9)
Prior to any work beginning the contractor must provide to the city a certificate of insurance for commercial liability insurance naming the city as an additionally insured in an amount not less than five hundred thousand dollars ($500,000.00), auto liability insurance in an amount not less than five hundred thousand dollars ($500,000.00), and workers compensation insurance as required by the State of Florida. The amounts of the insurance can be adjusted depending on the job.
(10)
Bid proposals must be opened at the time and place stated in the bid package. There must be at least one (1) witness to the opening in addition to the person opening the bid.
(11)
The purpose of the bid opening is only to record the vendors and the bid amounts. No analysis of the bids will be performed at the bid opening.
(12)
All bids shall be available for public inspection immediately after the bid opening.
(13)
All information within a bid shall be considered public information unless the information has been clearly marked as proprietary. No proprietary information shall be released without the written consent of the bidder except under a court order.
(14)
The city shall always have the right to waive irregularities, reject any and all proposals, request the item be rebid, or to negotiate separately with vendors.
(15)
All vendors responding to the bid package shall be notified of the results of the bid prior to city commission approval.
(16)
All bid awards shall be to the bidder who has the lowest cost, the most responsive and responsible, and which is in the best interest of the city.
(17)
The memo containing the recommended vendor shall contain the date the bid was advertised, the number of vendors receiving a bid package, a list of those vendors responding, and a recommendation to the city commission as to the most responsive and responsible bidder. This does not have to be the lowest bidder. However, if the lowest bidder is not chosen an explanation must be included.
(Ord. No. 92-9, §§ 1, 2, 5-14-92)